Photovoltaic roof for Riera Nadeu S.A

Riera Nadeu2

With Riera Nadeu, we set out to achieve the following challenges: achieving 20% self-consumption, installation on a waterproofed flat roof, maximum weight of 40 kg/m2, coordination with the construction company as it was a new building under construction, and zero accidents.

The installation of this photovoltaic roof reached a total of 100 kWp installed, surpassing initial expectations. This achievement translates into an annual production of 138,738 kWh of clean and sustainable energy. Even more impressive is the fact that self-consumption reaches 23%, exceeding the established goal and significantly contributing to the energy self-sufficiency of the installation.

In addition to the energy benefits, this installation also demonstrates a strong commitment to environmental responsibility by saving a total of 45.9 tons of CO2 per year. This directly contributes to reducing the carbon footprint and combating climate change.

KEY DATA

Compártelo

Otros posts

Contacta con nosotros

Feder hacienda pos

Desarrollo de un novedoso sistema modular de concentración fotovoltaica para invernaderos

El proyecto tiene como objetivo principal la investigación, diseño y desarrollo de novedosos sistemas modulares de concentración fotovoltaica (CPV) a partir de materiales transparentes, destinados a invernaderos, aumentando la potencia y concentración efectiva de la radiación respecto a los sistemas actuales.

RESULTADO CONSEGUIDO:
Hemos desarrollado un innovador sistema fotovoltaico de concentración modular, con lentes de Fresnel y seguimiento solar XY, que iguala el rendimiento de las placas tradicionales, mejora la generación de energía en el suelo y contribuye al aumento de los rendimientos agrícolas en invernaderos.

Duración

11/2022 – 12/2024

Inversión

383.282 €

Ayuda UE

325,789,70 €

Logo cdti 2024 con banderas soportes digitales